Sir, We have around 500 items as Insurance Spares in the stores. These spares are checked once in 6 months for their healthiness, storage, etc with a special checklist. We want this checklist an schedule in SAP ( MM). How to do it? Please help.We are presently doing it as similar to PM schedule ( PM module) but want it in MM module.
↧